Works
-
-
-
Guyang Ecological Intangible Cultural Heritage Characteristic Town
-
Wuyishan manting mountain house renovation and upgrading project
-
Memorial Site of the Fifth Division of the New Fourth Army in Jiukouyan, Suizhou
-
Architectural Renovation of Qingmaojing Scenic Area in Jiangxi Province
-
Planning and Design of Zero Carbon Demonstration Base in Baguazhou
-
-
Reconstruction and Upgrading Project of Dafeng Happy East Street
-
Renovation and New Building Design of No. 35 Historic Building in Wufu Lane
-
Renovation Design of Nanjing University Literature Research Institute
-
Nanjing University Gulou Campus Durian Garden Environmental Landscape Renovation Project
-
Renovation Project of Dormitory Building in Xianlin Campus of Nanjing University
-
Qixia District Lianzhu Market Risk Renovation Project Architectural Design
-
Reconstruction Project of Jiaye Branch of Daishan Community Service Center
-
-
-
Lancheng Xuzhou Chunshan Square Project Commercial Scenario Design
-
Landscape of Xicheng Track in Zhongshan Park Area of Jiangyin City
-
Regional Landscape Design of Red Pei Base and Memorial Hall in Jiukou Weir, Suizhou
-
Landscape Project of Nanjing Hongshan Cultural and Technological Integration Industrial Park
-
Renovation of Pukou Dizel Office Building
Classification:
Office Building
| Project Name: | Pukou Dizel Office Building Phase II |
| Project Location: | Nanjing City, Jiangsu Province |
| Project scale: | The land area is 14112 ㎡, with a total construction area of 35513 ㎡ |
| Design phase: | Scheme Design |
| Design time: | August 2023 |
Project Overview
The total land area of the project is 14000 ㎡. The land attribute is scientific research and development land. The overall plan is two office buildings, of which the first phase (building a) has been completed and the second phase (building B) is designed in this case.
General map optimization:On the premise of ensuring that the outline of the building remains unchanged, the traffic organization and greening design of the original scheme are optimized to improve the rationality of the streamline and meet the relevant requirements of the planning level.
Plane optimization:Optimize the internal plane of the second-phase office building to meet the new needs of the current enterprise office.
Facade optimization:The first phase (building A) office building has been completed, and the optimized facade scheme needs to be considered in harmony with the current facade and improved on its basis.