Works
-
-
-
Guyang Ecological Intangible Cultural Heritage Characteristic Town
-
Wuyishan manting mountain house renovation and upgrading project
-
Memorial Site of the Fifth Division of the New Fourth Army in Jiukouyan, Suizhou
-
Architectural Renovation of Qingmaojing Scenic Area in Jiangxi Province
-
Planning and Design of Zero Carbon Demonstration Base in Baguazhou
-
-
Reconstruction and Upgrading Project of Dafeng Happy East Street
-
Renovation and New Building Design of No. 35 Historic Building in Wufu Lane
-
Renovation Design of Nanjing University Literature Research Institute
-
Nanjing University Gulou Campus Durian Garden Environmental Landscape Renovation Project
-
Renovation Project of Dormitory Building in Xianlin Campus of Nanjing University
-
Qixia District Lianzhu Market Risk Renovation Project Architectural Design
-
Reconstruction Project of Jiaye Branch of Daishan Community Service Center
-
-
-
Lancheng Xuzhou Chunshan Square Project Commercial Scenario Design
-
Landscape of Xicheng Track in Zhongshan Park Area of Jiangyin City
-
Regional Landscape Design of Red Pei Base and Memorial Hall in Jiukou Weir, Suizhou
-
Landscape Project of Nanjing Hongshan Cultural and Technological Integration Industrial Park
-
Renovation Project of Dormitory Building in Xianlin Campus of Nanjing University
Classification:
Urban renewal
Building 03 of the first group of student dormitories in Xianlin Campus of Nanjing University is of frame structure, with 6 floors above the ground and a construction area of 21927.18 square meters. Building 04 of the first group of student dormitories is of frame structure, with 6 floors above the ground and a construction area of 21795.41 square meters. Building 08 of the second group of student dormitories is of frame structure, with 6 floors above the ground and a construction area of 4604.2 square meters. It has been more than ten years since the construction of the first group 03 and the second group 08 of the student dormitory in Xianlin campus was completed and put into use. The existing facilities and equipment are old and aging, and their functions are incomplete. The structure of the house needs to be strengthened; Some rooms need to be adjusted according to the use function; The indoor wall, ceiling and floor are newly updated; The toilet shall remove the existing wall and floor tiles and make them waterproof again, re-tile, replace the toilet partition, drainage ditch, stainless steel sink, etc. after removal; All doors, windows, railings, louvers, grilles, etc. shall be replaced; HVAC system and air conditioning equipment, water supply and drainage system (including air source hot water system), strong and weak current system, ventilation system, fire protection system, etc. shall be completely updated after removal.