Works


Nanjing Youth Olympic Group Sports Building Project


Classification:

Backup

+
  • 青奥1.png
  • 青奥2.png
Project Name: Renovation of Nanjing Youth Olympic Sports Building
Project Location: Nanjing City, Jiangsu Province
Project scale: 18517 square meters
Design phase: Full process consultation
Design time: February 2020-December 2021

 

With the development and changes of the city, many facades of existing buildings have gradually exposed problems that are out of touch with the times, such as insufficient beauty, backward functions, and high energy consumption. The purpose of this project is to improve the overall image of the building, meet the functional requirements of modern urban life, and improve the level of energy conservation and environmental protection through the renovation and design of the facades of existing buildings. The contents covered by the project include but are not limited to material selection, color matching, functional layout, structural safety, energy saving and environmental protection. This renovation takes into account various factors such as cost and effect presentation, and selects the form of adding aluminum grille on the facade to enhance the overall building image.